Search (1 results, page 1 of 1)

  • × author_ss:"Gonzalez, A.C."
  • × language_ss:"sp"
  1. Gonzalez, A.C.: Analisis y diseno de sistemas de gestion electronica de documentacion en grandes entidades (1997) 0.00
    0.0026825934 = product of:
      0.018778153 = sum of:
        0.008071727 = weight(_text_:information in 2923) [ClassicSimilarity], result of:
          0.008071727 = score(doc=2923,freq=2.0), product of:
            0.052020688 = queryWeight, product of:
              1.7554779 = idf(docFreq=20772, maxDocs=44218)
              0.029633347 = queryNorm
            0.1551638 = fieldWeight in 2923, product of:
              1.4142135 = tf(freq=2.0), with freq of:
                2.0 = termFreq=2.0
              1.7554779 = idf(docFreq=20772, maxDocs=44218)
              0.0625 = fieldNorm(doc=2923)
        0.010706427 = product of:
          0.032119278 = sum of:
            0.032119278 = weight(_text_:22 in 2923) [ClassicSimilarity], result of:
              0.032119278 = score(doc=2923,freq=2.0), product of:
                0.103770934 = queryWeight, product of:
                  3.5018296 = idf(docFreq=3622, maxDocs=44218)
                  0.029633347 = queryNorm
                0.30952093 = fieldWeight in 2923, product of:
                  1.4142135 = tf(freq=2.0), with freq of:
                    2.0 = termFreq=2.0
                  3.5018296 = idf(docFreq=3622, maxDocs=44218)
                  0.0625 = fieldNorm(doc=2923)
          0.33333334 = coord(1/3)
      0.14285715 = coord(2/14)
    
    Abstract
    The successful implementation of Electronic Document Management Systems (EDMS) requires a previous design based on a methodology that includes key steps as follows: capture of critical information and analysis of the current document situation: functional and/or technical options that involve the treatment of the document fonds considered; document management applications design (data, text, images, audio, video) under a functional, technical and economic focus; global and modular project defined as a strategic EDMS plan
    Date
    11. 2.1999 21:02:22